Impromptu Vacation

After going full bore and filling every weekend with something, I was finally able to negotiate some time off. 2 weeks worth of full break mode. A few hours after I had confirmed it, my wife sends me a picture of the cottage and it’s leaky roof. And some carpenter ants having fun under a large window set. Guess the vacation would be postponed.

The first weekend was some friends helping get the demo & framing done. The supporting joists were rotten, a separate set of windows was crooked, and an inside wall had suffered years of water damage. All of Saturday was fixing the exterior, straightening the wall, levelling the windows, insulating, and closing up with OSB/Tyvek. The large window repairs included cutting 8” of the floor. The ceiling over the dining area was full of years of mouse trappings. Holy moley. Sunday was setting new window trim for the siding. And then watching the roof repairs not work as expected and it leak inside the house.

Monday was more roof repairs and fixing the interior wall. I should mention it was a load bearing wall, and right on the load. Father-in-law is more than handy and it was a day and a half of work to get it sorted out. The good news is that even with the hose spraying the roof, the leaks are gone.

Tuesday was clean up work outside, shoring up the retaining wall in the crawl space, caulking and filling in holes.

Wednesday was about rebuilding the interior finish. Some white pine tongue & groove, over a cedar plank to cover the cut floor. The rad was going to cover the plank anyhow. With the large wood shortages around, we opted for some 1×5” pine trim. Looks pretty good.

Thursday was about finishing the ceiling in the dining area that had leaked. That was a very cathartic part of the project since its the room we tend to spend the most time in. The same large trim is on the ceiling, just as on the window trim. It’s a different look on the windows, since they are not the same size (off an 1 1/2”), but it still retains the cottage / wood look.

Friday was OFF, as was Saturday. Sunday was mostly off, but we needed to expand the size of the door on the shed by about 9”. A shed that’s 30+ years old, and far from level. Building on anything that’s not level is really hard, cause there’s no easy cuts, everything must be eyeballed. We opted to shore up some parts, shave some parts, and make it as level as possible.

Things that are left to do this week:

  • Put up the vinyl (should be here for next weekend)
  • Rebuild 2 access doors to the crawl space (4×4), including the framing)
  • Add some panels and caps to the extended shed door to close off the gaps
  • Install a 4×8 wood panel sheet on a rebuilt wall
  • Install quarter round in the living/dining room ceilings
  • Spread out the fill that’s in a few piles around to level the yard, which includes removing a good half ton of river rock (we have a homemade shaker)

And before end of season

  • Install some new rain gutters
  • Replace the roof
  • Install a vent in the crawl space

The end goal is that most people won’t see a large difference in the cottage, except some new colours. We will see doors that close level, windows that slide level, less water all over the place, and a shed door that is miles easier to get into / out of.

Oh, and get some fishing in too!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s